What you need to get an improvement location permit (Building Permit)
1. A drawing to scale of:
a. The property boundary with dimensions
b. All existing structures (improvements) with dimensions
c. All proposed structures (improvements) with dimensions and heights
d. All driveways or access ways onto the property with dimensions
e. All public right of ways (streets, roads, etc…)
f. All easements on the property with dimensions
g. LOCATION OF WELLS AND SEPTIC SYSTEMS (A PROPOSED WELL NEEDS TO BE FIFTY (50) FEET FROM A PROPERTY LINE)
A visual scale bar must be located on the drawing.
A north arrow must be located on the drawing.
The use of the existing and proposed structures.
$30 Improvement location permit fee in form of a check (payable to Area Plan Commission) or cash.
Construction must begin 180 days after receiving an improvement location permit.
Construction must be finished 2 years after receiving an improvement location permit.
Table 9-15, Lot Sizes & Setbacks and Height Restrictions
(1) A setback shall be the distance between the right-of-way of a public way or a property line to a principal and/or accessory structure. A right-of-way of a public way shall take precedent wherever it overlaps the property line.
(2) Heights shall be measured from the highest section of the structure to the average land elevation of the parcel on which said structure is built.
(3) If a proposed Minor Subdivision is located more than two hundred (200) feet from an existing Public Way, a twenty five (25) foot wide access strip that is contiguous with an existing Public Way and the proposed Minor Subdivision shall be deeded with proposed Minor Subdivision to allow for two-way traffic onto and off an existing Public Way.
(4) A platted lot in a Major Subdivision or PUD may be located behind other platted lots if a twenty five (25) foot wide access strip that is contiguous with an existing Public Way is platted with said lot and if proposed lot has been approved in writing by the local legislative body under whose jurisdiction the Major Subdivision or PUD is to be located.